Hi! Welcome to our project page. Here we give a brief summary of the heuristics we used and programs we built to create our train schedules!

Summary

The final solution we used was inspired by the traditional method used by train schedulers: manual adjustments based off of analysis of data. We developed a highly informative and rich visualization of each schedule which allowed us to pinpoint exactly where the periods of congestion and chokepoints were on our line, and how much remaining capacity was left on each train as it visited the stops. This allowed us to determine whether we should move more trains to a certain point in time. The final proposed schedule is labeled finalSchedule.csv.

SampleSchedule

Design

Our intuition for computationally finding solutions for optimizing train schedules led us to first focus on building a "grader" to evaluate how good a given train schedule was. We also decided that visualizing the schedule would be of help to our project, and thus added that to our design. Essentially, we found that the overall workflow for developing a solution started with grading and visualizing the provided baseline schedule so that we can learn from and improve off of. We subdivided these jobs into 2 folders, TrainSolution for the grading and SolutionVisualization for the visualizing. Above you can see the visualized sample schedule provided by RailVision.

TrainSolution

Grading

The grading consisted of adding each passengers arrival time at each station as a value we track within a queue, with one queue representing each station. We then iterated through the schedule. For each train within the schedule, we know the time the train arrives at each station, and the number of passengers the train picks up. We can simply subtract the arrival time of the passenger from the arrival time of the train to obtain how long a passenger was waiting at a stop, allowing us to average the value when done for all the passengers.

Solving

The solving and generation was more involved, and required the breaking down of the problem into two subproblems. The problem of choosing when to send a train down the line, and the problem of deciding how many passengers to take from each station for each train. We used two heuristics, one was that rather than trying to minimize the average wait time of each passenger, we reduce the problem into trying to minimize the number of passengers on the platform at all times. This difference might seem small, but this realization was key in allowing us create a viable program. The second heuristic was to evaluate a score for the passengers at each station, with passengers at further stations having larger scored based on the time it takes for a train to reach them. This greedy choice simply chooses the passengers with the largest wait times at each station and chooses which passenger to pick up accordingly. This heuristic resulted in the following visualization.

SolvedSchedule

We encountered some bugs in the integration with our visualization code here. Specifically some plots given by our schedule generator resulted in some negative passenger values at some times at some stations. This is obviously impossible, but we can confidently attribute it to the 3 extra minutes attributed with the dwelling time a train took at each stop, along with passengers arriving at the station within these three minutes. It is not an issue with the train schedule which remains consistent with all requirements. Future iterations would remedy this bug.

Manual Heuristic

Visualization

Towards the end of our time in this hackathon one of our group members developed and found a more mathematic manual heuristic for designing a more optimal schedule. Though we have yet to model it computationally, we were able to find and design a schedule that performed better than both our TrainSolution schedule and the provided example schedule.

MelodysSchedule

Heuristics

The following is the manual heuristic we designed with respect to the excel visualization we performed:

Let T1,…,T19 represent the respective passenger arrival times. Let Ti represent a general passenger arrival time at Station A.

The best case wait time for passengers at Station A is 0 minutes where the train arrives exactly at the same time at Ti. Then, after the dwell and transition time to Station B, the train will arrive at Station B at passenger arrival time T(i + 1) and the minimum wait time for passengers that arrive at T(i + 1) is 1 minute.

Lastly, after the dwell and transition time to Station C, the train will arrive at Station C at passenger arrival time T(i + 2) and the minimum wait time for passengers that arrive at T(i + 2) is 3 minutes. This is reflected in the coloured fill pattern of the excel cells where the fill pattern follows a downward-right diagonal pattern. By aiming to maintain this pattern, the wait times can be reduced. However, this pattern is limited due to the limited number of trains, passenger limit for each train and trains that arrive first and last to the scheduled time period.

For the first train, the soonest that the train can arrive to Station B is at 7:11am and the soonest that the train can arrive to Station B is at 7:23. There is no possible way of reducing the wait times for passengers who arrived earlier at Stations B and C. For the last train, it must arrive at the latest passenger arrival time, 10:00am and noticeably, there exists longer wait times for passengers at Station B and Station C. However, this is due to the limited number of trains during the morning commute and as there are less passengers in comparison to the peak commuting time, longer wait times are more acceptable.

You might also like...

This is a Bukkit-Event based AntiCheat created cause of a challenge.

XAC - XAntiCheat This is a Bukkit-Event based AntiCheat made out of a challenge with a friend of mine. Its not recommandable to use and also a bit exp

Apr 6, 2022

30 Days Coding Challenge with Arsh Goyal.

#ReviseWithArsh #6Companies30Days #ArshGoyal #ReviseWithArsh #6Companies30Days Challenge! Offical Doc:- Explore the docs » Offical Video:- Explore the

Jan 3, 2023

6-Companies-in-30-Days - A challenge 💪 by Arsh Goyal

6-Companies-in-30-Days - A challenge 💪 by Arsh Goyal 1st Company - Goldman Sachs Q.1 Print Anagrams Together -- Solution Q.2 Overlapping rectangles

Jan 6, 2022

Desafio Alura Challenge para backend. Criando uma API REST de controle de orçamento utilizando JAVA.

Desafio Alura Challenge para backend. Criando uma API REST de controle de orçamento utilizando JAVA.

Jun 16, 2022

Challenge: Learn Object Oriented Programming in Practice

Challenge: Learn Object Oriented Programming in Practice The main objective is to put into practice one of the main tools of OO: ABSTRACTION, ENCAPSUL

Sep 4, 2022

Robot code for FRC 2020 challenge

frc-code Robot code for FRC 2020 challenge STUFF I FOUND ABOUT THE GYROSCOPE also we all need to read the docs from last year. this Ian guy is our god

Jan 22, 2022

API RESTful Challenge

developer-challenge API RESTful Challenge API feita com java e hospedada no Heroku #Adicionar país Metodo: [POST] https://challenge-rest-api.herokuapp

Sep 7, 2022

Robot code for First Robotics Challenge for 2022.

rapid-react-robot-code-2022 Robot code for First Robotics Challenge for 2022. The pictures folder is for the embedded photos. Don't delete it. Prerequ

Feb 22, 2022

Challenge of JavaIsland: Javadoc

ByteLegend Challenge of JavaIsland: Javadoc English Fix Broken Javadoc Why We Create Such a Challenge Javadoc is corner stone of documentations in Jav

Jul 14, 2022
Owner
Bryan Ding
Bryan Ding
This is a Bukkit-Event based AntiCheat created cause of a challenge.

XAC - XAntiCheat This is a Bukkit-Event based AntiCheat made out of a challenge with a friend of mine. Its not recommandable to use and also a bit exp

ytendx 3 Apr 6, 2022
30 Days Coding Challenge with Arsh Goyal.

#ReviseWithArsh #6Companies30Days #ArshGoyal #ReviseWithArsh #6Companies30Days Challenge! Offical Doc:- Explore the docs » Offical Video:- Explore the

Ankit Kumar 17 Jan 3, 2023
6-Companies-in-30-Days - A challenge 💪 by Arsh Goyal

6-Companies-in-30-Days - A challenge ?? by Arsh Goyal 1st Company - Goldman Sachs Q.1 Print Anagrams Together --> Solution Q.2 Overlapping rectangles

Aniruddha Inge 1 Jan 6, 2022
Desafio Alura Challenge para backend. Criando uma API REST de controle de orçamento utilizando JAVA.

Desafio Alura Challenge para backend. Criando uma API REST de controle de orçamento utilizando JAVA.

Allan Cordeiro 1 Jun 16, 2022
Challenge: Learn Object Oriented Programming in Practice

Challenge: Learn Object Oriented Programming in Practice The main objective is to put into practice one of the main tools of OO: ABSTRACTION, ENCAPSUL

njtsb1 0 Sep 4, 2022
Robot code for FRC 2020 challenge

frc-code Robot code for FRC 2020 challenge STUFF I FOUND ABOUT THE GYROSCOPE also we all need to read the docs from last year. this Ian guy is our god

null 1 Jan 22, 2022
Robot code for First Robotics Challenge for 2022.

rapid-react-robot-code-2022 Robot code for First Robotics Challenge for 2022. The pictures folder is for the embedded photos. Don't delete it. Prerequ

null 4 Feb 22, 2022
Challenge of JavaIsland: Javadoc

ByteLegend Challenge of JavaIsland: Javadoc English Fix Broken Javadoc Why We Create Such a Challenge Javadoc is corner stone of documentations in Jav

null 2 Jul 14, 2022
Algorithms Made Easy May 10 Challenge

Algorithms-Made-Easy-May-Challenges Algorithms Made Easy May 10 day 30 problems Challenge Hi ??‍?? , I'm Rohit Kumar Singh All Leetcode Soluton Connec

Rohit Kumar Singh 6 May 24, 2021
Repository for FIRST Tech Challenge team 3916 Apex Robotics for the 2021-2022 game year (Freight Frenzy)

FTC Team 3916 - Apex Robotics This is our repo for the 2020-2021 game year - Ultimate Goal Installation Clone this repo. You can do this through the w

Aman Anas 6 Nov 4, 2021